Facade caulking and sealant replacement in NYC for apartment buildings, co-ops, and commercial properties. We cut out cracked and failing sealant around windows, expansion joints, and panels, and reseal them properly so water stays out of the building.
Facade caulking is the flexible sealant that fills the joints in a building’s exterior, around window frames, between precast or metal panels, and in the expansion joints that let brick and concrete move with the seasons. Sealant replacement is the process of cutting out that material once it has cracked, hardened, or pulled away, preparing the joint, and installing new sealant that bonds properly and can stretch and compress without failing. It sounds like a small job, but on a tall building, failed sealant is one of the most common reasons water gets into apartments, and caulk that’s simply smeared over old caulk rarely lasts a season. Done properly, with the old material removed, the right backing installed, and a sealant chosen for each surface, a sealant replacement protects the facade for years.
Every joint on a facade moves, and each type moves differently. We replace sealant with that movement in mind, so the new joint flexes with the building instead of tearing loose.
Sealant around window frames replaced to stop leaks into apartments.
Movement joints in brick and concrete resealed so the wall can move without cracking.
Joints between precast, metal, and glass panels cut out and resealed.
Caulk split down the middle after years of stretching and sunlight.
Joints where the caulk has lost its grip on one side.
Brittle, chalky, or missing sealant that no longer flexes.
Expansion joints wrongly filled with mortar, causing cracks nearby.
A sealant joint only works if it’s built correctly from the inside out, so most of our work happens before the new caulk goes in.
Old sealant removed completely and the joint cleaned and primed where needed.
Backing installed so the new sealant has the right depth and shape to stretch.
Silicone, polyurethane, or hybrid sealants chosen for each material.
Test pulls on cured sealant to confirm it’s bonding properly.
Sealant replacement is detail work at scale, often hundreds of joints on a single building, so consistency matters as much as skill.
We map the joints, check how the old sealant is failing, and test older caulk where the building's age calls for it.
Old sealant is removed, joints are cleaned and backed, and new sealant is installed and tooled.
Joints are inspected, adhesion is tested, and the finished work is photographed for your records.
Upper-floor joints are usually reached from suspended scaffolds, which are set up by DOB-licensed riggers.
Caulk installed between 1950 and 1979 may contain PCBs, so it’s tested and handled properly before removal.
Deteriorated sealant is often noted in Local Law 11 reports as a maintenance item.
Caulking a tall facade means working at height, sometimes with older materials that need care before removal.
Sealant work is priced by the joint, so a careful count and survey come first.
How much sealant needs to be cut out and replaced.
Narrow window joints versus wide expansion joints.
Scaffolding, suspended platforms, or lifts.
Hardened caulk, testing, and special handling if needed.




Most failed caulking we see was installed over old sealant, without backing, or with the wrong product for the surface. Our joints are built properly from the start, so they keep sealing season after season.
No new caulk over old caulk, ever.
Products chosen for brick, metal, glass, or concrete.
Proper depth and backing so sealant stretches, not tears.
Adhesion checks and photo records on every job.
We replace facade sealant on apartment buildings, co-ops, condos, and commercial properties throughout four NYC boroughs and Westchester County.
High-rise windows, curtain walls, and panelized facades.
Brick apartment buildings and newer mid-rise condos.
Co-op towers with long runs of window joints.
Apartment buildings with brick expansion joints.
Sealant replacement on buildings in Yonkers, White Plains, and beyond.
It depends on the sealant, the joint design, and how much sun and weather the joint takes. Even well-installed sealant wears out long before the brick or concrete around it, so it's normal for a building to need sealant replacement more than once in its life.
It shouldn't be. New sealant doesn't bond properly to old, failing caulk, so it peels away quickly and the leak comes back. The old material has to be cut out completely and the joint prepared before new sealant goes in.
The sealant is chosen for the materials on each side of the joint and the movement it has to handle. Silicone, polyurethane, and hybrid sealants each suit different surfaces, and we match color to the facade where appearance matters.
Failed perimeter sealant is one of the most common causes, since it's the seal between the window frame and the wall. Leaks can also come from the window itself or the flashing below it, so we check the joint before assuming caulk is the only problem.
No. Expansion joints are designed to let the wall move, and filling them with mortar locks the wall in place, which often causes cracking nearby. They should be filled with a backer rod and flexible sealant instead.
Yes. According to the EPA, caulk used in buildings built or renovated between 1950 and 1979 may contain PCBs. On older buildings, the existing sealant should be tested before removal, and any PCB material handled according to the rules.
Yes. Most facade sealants come in a wide range of colors, and we match the new joints to the brick, stone, or window frames so the work blends in.